Dam Repair and Rehabilitation

This field is for validation purposes and should be left unchanged.
Lake Junaluska Dam Repair Project

Lake Junaluska Assembly, Inc. is initiating a project to repair and rehabilitate the Lake Junaluska Dam. This project focuses on essential maintenance to ensure the long-term safety and structural integrity of the concrete portions of the dam, which was originally built in 1913.

Mandatory Site Visit - Lake Junaluska Dam Repair

Mandatory Pre-Proposal Site Visit

Attendance Requirement

A mandatory pre-proposal site visit is required for all firms intending to submit a proposal. Attendance is a strict prerequisite; firms that do not attend will be disqualified from the RFP process.

Meeting Logistics

  • Location: Dam Access Gate / Parking Area.
  • Scheduling: The visit must be scheduled in advance with the project manager.

Scope of Visit

The visit will include access to the dam crest, upstream and downstream slopes, spillway, and outlet works. Relevant background documents, including prior inspection reports and available as-built drawings, will be distributed to all attendees.

Inquiries

Any questions arising from the site visit must be submitted in writing no later than June 8, 2026.

Please fill out the information below to schedule a visit.

Name
Address(Required)